+44 (0) 208 191 0156 Mon–Fri 9.30am–16:30pm
Alliance Member
B2B  ·  Manufacturer Direct Pricing Partner Application

DTECH Articles

11/05/2026

Why Fibre Optic Prices Have Increased in 2026

If you have priced fibre optic cable in the last six months and been surprised by what you found, you are not alone. From late 2025 into 2026, global fibre...

02/02/2026

What is Structured Cabling: A Complete Guide for IT Managers and Installers

Structured cabling is the term for a building's permanent telecommunications wiring infrastructure — the cables, outlets, patch panels, and distribution equipment that form the physical foundation every networked device in...

09/02/2026

What is a Patch Panel: Why They Matter and How to Choose

A patch panel is one of those components that is easy to overlook when planning a network — it does not switch, route, or process data, and to the uninitiated...

01/08/2025

Single Mode vs Multimode Fibre: OM3, OM4 and OS2 Explained

When fibre optic cabling comes up on a project, the conversation usually moves quickly to OM3, OM4, or OS2. These designations tell you everything about what a cable can actually...

02/03/2026

OM4 vs OM5 Fibre: What’s the Difference and Which Should You Specify

When OM5 was introduced in 2016 it generated considerable interest — a new multimode fibre grade promising wideband capability, more data over fewer fibres, and a clear upgrade path beyond...

16/03/2026

Internal vs External Data Cable: What’s the Difference and How to Choose

One of the most common specification errors in structured cabling installations is using standard internal cable on a route that passes outside — through an external wall, across a roof,...

01/06/2025

Fibre vs Copper Data Cable: Which Should You Choose?

Copper or fibre — it's the first question on most cabling projects, and it rarely has a simple answer. The right choice depends on what your network needs to do...

01/09/2025

Fibre Optic Connectors Explained: LC vs SC and UPC vs APC

Fibre optic connectors come up on every installation project, and the terminology around them trips people up more than it should. LC or SC? UPC or APC? Blue or green?...